Laserfiche WebLink
1 WRITTEN ROUTINE MONITORING PROCEDURE <br />® ® as required by California UST Regulations, Section 2632(d)(1) <br />Quik Stop Market #124 <br />505 North Main Street <br />Manteca, California <br />The secondary containment of each underground storage tank and product line is continuously <br />monitored by a Universal Sensors "Leak Alert" LA -04 electronic monitor using liquid sensing <br />probes set to immediate response time. The monitoring panel is located in the backroom. <br />The "Leak Alert" monitor is placed in test mode daily by Prem or Kamal Singh, Franchisees, or <br />their designated duty clerk, and the results recorded on the "Daily Monitoring System Inspection <br />Log". The monitoring panel and interstitial sensors are checked and recertified annually. The <br />results are forwarded to San Joaquin Public Health Services. <br />In the event that the system goes into alarm, the Franchisee will immediately contact the Quik <br />Stop Gasoline Department, which will in turn dispatch a qualified service company to the site. <br />The service company will determine the cause of alarm and notify Quik Stop of site conditions. <br />If an unauthorized release to secondary containment has occurred, action will be immediately <br />taken to implement the Written Response Plan. <br />The product delivery lines are also monitored continuously by "Red Jacket" in-line mechanical <br />leak detectors. The mechanical leak detectors are tested annually and the results forwarded to <br />San Joaquin P.H.S. <br />In addition to the annular space monitoring described above, daily inventory records are <br />maintained and submitted for Statistical Inventory Reconciliation (SIR). The SIR results are <br />kept on site for review by regulatory agencies. <br />Preventive maintenance on the monitoring system is scheduled annually in conjunction with <br />recertification and testing. <br />A description of the gasoline system operation and operator's responsibilities are included in the <br />Franchise Agreement. Initial training in operation of the tank system and monitoring equipment <br />is conducted "on the job" under the supervision of Quik Stop personnel. The training period <br />depends upon the complexity of the system and Franchisee proficiency. <br />