Laserfiche WebLink
SECONDARY PIPE TESTING <br /> e <br /> fa... . <br /> tr4dustrQ. ►Qfesswna{:. tX r::::>:::<:>:::a::>4ttxer::: e:bel . <br /> ................ <br /> :...:....::................:.::::._::::::.:::.:::::.::: :: . . :.::( :.;:.;:.;:.;: :.:::.;:.;: <br /> . ....... . . <br /> 1ESCM e: <br /> E�tess#are; <br /> _......_.....................-- «:.:::::::::::::::::::::::::.: Q.H....:©sta t;;:;;.;::.;:.; :.;;;; .0.:: 1w see.belo <br /> _..:.................._............:..::.:::::::::::::: ::XX........ f <br /> E.'�SGCI'Cri Il mu re G;rage ge t1 t►itf#� ). <br /> Pin <br /> Pipe Manufacturer <br /> P Ameron Ameron Ameron <br /> Pipe Type FRP FRP FRP <br /> Primary Pipe Diameter(inches) 2" <br /> 2" 2" <br /> Secondary Pipe Diameter(inches) 3" <br /> 3" 3.. <br /> Product Stored Gasoline-89 <br /> Gasoline-87 Gasoline-91 <br /> Method of secondary i isolation <br /> ry P pe Termination Boot Termination Boot Termination Boot <br /> Location of secondarypipe isolation Sump p Sump Sump <br /> Estimated length of piping run feet 45' <br /> 9 P P 9 (feet) 55' 65' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize hr:min 0:10 <br /> ( ) 0:07 0:13 <br /> Test start time 11:30 <br /> AM 11:35 AM 11:50 AM <br /> Initial pressure(psig) 5 5 <br /> 5 <br /> Test end time 12:30 PM 12:35 <br /> PM 12:50 PM <br /> Final pressure(psig) 5 5 <br /> 5 <br /> Test duration hours:minutes 1:00 <br /> ( ) 1:00 1:00 <br /> Change in pressure(psig) 0 0 <br /> 0 <br /> Pass/Fall threshold(psig) 0.5 0.5 <br /> 0.5 <br /> AR LT <br /> PASS <br /> PASS <br /> Comments: <br /> 0 2002 Walton Engineering,Inc. <br />