My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2003-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 10:22:04 AM
Creation date
6/3/2020 9:49:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2009
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_2003-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON PRODUCT LINE TESTING <br /> ENGINEERING, INC. DATA SHEET <br /> Facility: Quik Stop Market#124 Test Equipment uses: AcuRite TM <br /> Address: 505 N. Main Street I ITest Method By: Manufacturer <br /> city,state Manteca, CA 95336 Line Manuftcturer. Ameron <br /> Test Date: December 14, 2007 1 Line Material FRP <br /> Line# 1 2 3 <br /> Line Product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Line Diameter [Inches] 2 2 2 <br /> Line Length [Feet] {Est.} 50 40 60 <br /> Line Capacity [Gallons] {Approx.) 8 7 10 <br /> Line Pressure @ Dispenser [PSI] 25 27 26 <br /> Test Pressure [PSI]{1%x LP}{Min 50} 50 50 50 <br /> "STP" Isolation Mechanism Ball Valve Ball Valve Ball Valve <br /> "Disp." Isolation Mechanism Shear Valve Shear Valve Shear Valve <br /> Time Line Shut Down 1:37 PM 1:37 PM 1:37 PM <br /> Test Start Time 2:20 PM 2:20 PM 2:55 PM <br /> Test End Time 2:50 PM 2:50 PM 3:25 PM <br /> Test Duration [h:mm] 0:30 0:30 0:30 <br /> Initial Cylinder Level {ICL} 0.0800 0.0875 0.0825 <br /> Final Cylinder Level {FCL} 0.0800 0.0875 0.0825 <br /> Volume Lost [Gallons] {ICL-FCL} 0.0000 0.0000 0.0000 <br /> Indicated Leak Rate [GPH] 0.0000 0.0000 0.0000 <br /> Pass/ Fail Threshold [GPH] 0.0100 0.0100 0.0100 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.