My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2003-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 10:22:04 AM
Creation date
6/3/2020 9:49:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2009
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_2003-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIT9SING SYSTEM CERTIFWATION <br />CERTIFICATION /TEST DATE: December 17, 2007 <br />Al. FACILITY <br />Yes <br />❑ <br />A2. OWNER <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Name <br />Quik Stop Market #124 <br />❑ <br />Name <br />Quik Stop Markets, Inc. <br />Address <br />505 N. Main Street, Manteca, CA 95336 <br />❑ <br />Address <br />4567 Enterprise Street, Fremont, CA 94538 <br />Phone # <br />510-657-8500 <br />❑ <br />Phone # <br />510-657-8500 <br />Contact <br />Michael Karvelot <br />❑ <br />Contact <br />Michael Karvelot <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />IF. IN -TANK GAUGING / SIR EQUIPMENT: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />IG. LINE LEAK DETECTORS (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />❑ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(check all that apply) Simulated leak rate: 9 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ <br />N/A <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />This is a MSC modification test after ISD installation and cold start. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.