My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2003-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 10:22:04 AM
Creation date
6/3/2020 9:49:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2009
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_2003-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IM177 11111111111111111111 Irr IIII IRWIN III X ir �� 111 11 P 111511 <br />T . .11 11 101 V, ; I ; 111111111111, 1 <br />E�= � <br />n, 7_71411 <br />- 9" Lineman's Pliers <br />$so I I e TMWW7411�_ �_ <br />Assorted Allen Wrenches <br />Wire Cutters/Strippers 18 AWG and • AWG <br />3/8!'D611 Assembly <br />* Assorted Drill Bits 1116" through 7116' <br />* 1/2" (5/8" O.D.) Copper Tube Bending Tool <br />* 1/2" (5/8" O.D.) Copper Flaring Tool <br />1 1/8" Sheet Metal Hole Punch (for Potted Conduit <br />Assembly) <br />110MM <br />12" adjustable Wrench <br />18" Channel lock ■ <br />Pipe Wrench <br />Hand Pipe Threader (for up to 1" pipe) <br />Pipe Cutter (for up to I " pipe) <br />Tape Measure <br />Teflon Tape <br />Thread Sealing Compound <br />1/2" or 3/8" Ratchet set w/Sockets 1/4" through 9/16" + <br />3" EIension <br />Dispenser Access <br />• Secure dispenser access keys from station management. <br />• Lock -out and tag -out all electrical power to dispenser being modified. <br />• Remove dispenser panels and open doors as required for installation. <br />• Survey <br />Close inspection of the dispenser is needed before any work begins. The survey should include the following <br />observations: <br />• What vapor recovery system (if any) is currently installed — Balance or VAC Assist? <br />• Does the existing vapor piping have any obstructions inline such as solenoid valves or ball valves? <br />.I <br />Before • the Vacuum Pump <br />• Allow spacing for inlet piping test port and • valve. <br />• An unobstructed path • the installation of vapor tubing. <br />• Allow space for electrical conduit components. <br />9M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.