Laserfiche WebLink
A L <br />SPILL CONTAINER CONTAINMENT TESTING <br />Test Method By: <br />Test Method Uses: <br />Measuring EquipmentUsed: <br />_ Manufacturer • Industry Standard <br />C> Pressure Vacuum <br />Level Change Indicator <br />: Professional Engr. <: Other (see below) <br />• Hydrostatic O Other (see Wow) ' <br />(Caldwell! System 2001 t Watton Engineering) <br />Description <br />Tank #1 <br />Tank #2 <br />Tank #3 <br />Spill container manufacturer <br />OPW <br />OPW <br />OPW <br />0:05 <br />0:05 <br />Spill container capacity (US gallons) <br />5 Gallons <br />5 Gallons <br />5 Gallons <br />16.00 <br />t time <br />Test starTEST <br />Spill container depth (inches) <br />16.00 <br />15.50 <br />16.25 <br />11:30 AM <br />11:35 AM <br />Product contained <br />Gasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />0:30 <br />Change in water level (± 0.000 inches) <br />Is Spill container located in a sump? <br />Yes <br />Yes <br />Yes <br />0.005 <br />0.005 <br />Does sump have a liquid sensor installed? <br />No <br />No <br />No <br />PASS <br />Distance between fill adapter and <br />vapor adapter <br />16" <br />16" <br />16" <br />Condition of spill container prior to testing <br />Comments: <br />Dry <br />Dry <br />Dry <br />Portion of spill container tested <br />Entire <br />Entire <br />Entire <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:05 <br />0:05 <br />Depth of water level from bottom (inches) <br />15.75 <br />15.25 <br />16.00 <br />t time <br />Test starTEST <br />11:00 AM <br />11:05 AM <br />11:50 AM <br />centers inches <br />11:30 AM <br />11:35 AM <br />12:20 PM <br />Condition of spill container prior to testing <br />Comments: <br />Dry <br />Dry <br />Dry <br />Portion of spill container tested <br />Entire <br />Entire <br />Entire <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:05 <br />0:05 <br />Depth of water level from bottom (inches) <br />15.75 <br />15.25 <br />16.00 <br />t time <br />Test starTEST <br />11:00 AM <br />11:05 AM <br />11:50 AM <br />Test end time <br />11:30 AM <br />11:35 AM <br />12:20 PM <br />Test duration (hr:min) <br />0:30 <br />0:30 <br />0:30 <br />Change in water level (± 0.000 inches) <br />0.000 <br />0.000 <br />0.000 <br />Pass/Fail threshold (0.005 inches! Hr.) <br />0.005 <br />0.005 <br />0.005 <br />RESULT <br />PASS <br />PASS <br />PASS <br />© 2003 Watton Engineering, Inc. <br />