Laserfiche WebLink
505 N Main St, Manteca Record ID PR0231442 <br /> 6/16/2017 <br /> PHOTO#6 <br /> Picture of 12/1/2016 desi nated operator monthly inspection report. The incorrect date is written for the secondary containment testing. <br /> wn.. <br /> �UUNL RG=GROUND STORAGE TANK(UST) 0 Pw dFV, <br /> rT _ ,. U t fID <br /> ECK ( i <br /> rx�_ <br /> y ,ry '`' a bocemh's`r 1,2016 <br /> K, <br /> Exptratlon March 20,2015 <br /> h.r w <br /> 7 � <br /> _ 711111 <br /> > <br /> Monrtortn y--`"u A'EL YAL :k 'HIST.. ., ij <br /> g s stem rs owerod on and In proper operating mode .. <br /> 2 Monitoring system is NOT currently snawln <br /> A� <br /> ffi ,r1�..rr'24� <br /> 9 Alarm history report/log for the prsvious n onth is available.and has beenreuleweq.b the Dee ■ ❑ � <br /> 3s Is s copy of the aramr history report/log.to this lorm7 tar, ■ L� q <br /> ]] i, s <br /> 4 Each start"for the previous month hos been respondatl to appropriately ■ <br /> 5 Sensors boated in tank-top containment sumps have NOT alarmed In heyas`4`me <br /> sumps Yt CI 3 <br /> Sa List all tank-lcp ""Isere alarms <br /> occurred in the past 11)pnit,: v;A C I u ode r <br /> x <br /> ,.gym <br /> s <br /> Sump Locallon <br /> Sump Location; <br /> " .. <br /> � Sump Locationi = <br /> Spill Containment Structures era Gee afi6 r,^i'!` s;a 'aze bus'su6stance: <br /> Y '�, N NA <br /> Tank i -Gasoline 87 ■ ' � � � �, <br /> Tenk 2...'Gasolne 89 ■ C7 0�I Tank 3 Gasoline 91 <br /> iia 1�#fir' <br /> 8 Under-dispenser containment arses are free of water,debris,and hazardous substance. Sensors are)ceased properly. <br /> Y N I NA <br /> t <br /> Dispenser 112 ■ � ' <br /> Dispenser 3/4 ■ [� d <br /> PAPERWORK INSPECTION <br /> 'i 9 Monitoring system cerhfioatlon ties been Completed within the past 12 months. f <br /> 10 Secondary containment tests have been completed within the required timeframe.I a <br /> 11 Spill containment structure(bucket)testing was completed within the past year <br /> f2 Tank tightness testing was completed within he required timeframe. <br /> 13 Linetightness testing was completed within the required timetrarne. <br /> e 14 Other required testing/maintenance was completed within the required tamoffam, (List ilams holow) <br /> r` Test/Maintenance Air Quality`rest. 05/18116 <br /> Test/Mainto,wnce <br /> John Alaniz, EHS Trainee Page 6 of 6 <br />