Laserfiche WebLink
O Pq U l /y C <br />SAN JOAQUIN COUNTY <br />Q' -+ ENVIRONMENTAL HEALTH DEPARTMENT <br />W: <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sioov.orq/ehd <br />�q�iFORa�P <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: Inspection Date: <br />Facility Address: fService Request #: <br />/Y1rd ih 66 eue .S,c b <br />Onsite Service Technician's Name: ICC S,-9ervice Technician/Installer Exp. Date: Manufacturer Training: <br />Cly ka j eeadI :1P j /G -ib 4 vm -,j <br />�- <br />SERVICE <br />Aut C&r o J4, <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />Aut C&r o J4, <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />Aut C&r o J4, <br />Cu d" -fit'eall <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />L <br />ec7ivBy: <br />Title: <br />Nj v e <br />EHD 23-04 <br />Rev 4/30/12 <br />UST SERVICE REQUEST INSPECTION REPORT <br />