Laserfiche WebLink
Healy <br />CAS <br />• Furnish and install a new Veeder-Root BIR Protocol DIM <br />module <br />• Perform a "cold start" of the Monitoring System, including <br />the ISD mapping and turning over the sensors to create a <br />history. <br />• Perform a formal Monitoring System Certification with a <br />report to the local COPA. <br />W. Alameda St. <br />Legend <br />O Gasoline - 87 <br />40 Gasoline - 89 <br />Gasoline - 91 <br />ODiesel <br />vapor <br />OAnnular <br />Submersible Turbine Pump <br />O TLM Probe <br />Monitoring System Panel <br />8 Emergency Shut -Off Switch <br />Overfill Alarm <br />g Float & Chain <br />CJ Sump/UDC Sensor <br />Interstitial Sensor <br />Vacuum Sensor <br />® Line Leak Detector <br />ISD Flow Meter <br />Q ISD Pressure Sensor <br />Ori Spill Containment Kit <br />N <br />U <br />K O <br />O <br />Z <br />n <br />O <br />� a <br />_ <br />_ <br />3 <br />O <br />N <br />- _ <br />�# <br />to <br />N LO <br />Y <br />U) 0) <br />Q <br />3 U <br />— <br />CL <br />O <br />Z ami <br />.� <br />C) <br />o m <br />Y_ <br />