Laserfiche WebLink
Heely <br />CAS <br />• Furnish and install a new Veeder-Root BIR Protocol DIM <br />module <br />• Perform a "cold start" of the Monitoring System, including <br />the ISD mapping and turning over the sensors to create a <br />history. <br />• Perform a formal Monitoring System Certification with a <br />report to the local COPA. <br />00 Ic <br />w'sF <br />a <br />W. Alameda St. <br />Legend <br />GGasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />O Diesel <br />Vapor <br />OAnnular <br />7 Submersible Turbine Pump <br />Q TLM Probe <br />Monitoring System Panel <br />8 Emergency Shut -Off Switch <br />Overfill Alarm <br />Float & Chain <br />[3 Sump/UDC Sensor <br />.. Interstitial Sensor <br />® Vacuum Sensor <br />® Line Leak Detector <br />ISD Flow Meter <br />Q ISD Pressure Sensor <br />W Spill Containment Kit <br />m <br />C: �a <br />O g <br />L <br />d <br />5 d <br />0 <br />Z <br />n <br />Q N <br />co <br />3 <br />w <br />00 <br />N <br />_ <br />N L0 <br />_ <br />(A 0) <br />(� <br />c Q <br />- <br />O <br />Z ani <br />U) <br />o <br />Y <br />L <br />