My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_1985-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 1:03:10 PM
Creation date
6/3/2020 9:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1996
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_1985-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 8, 1993 <br />• •' 'r• 01 <br />1. Site Name Unocal SS If 5417 <br />2. Site Address 1700 E Yosemite Ave Manteca, CA_ 95336 <br />3. Describe the frequency Of performing the Monitoring Method. <br />Continuous Monitoring System <br />4. what Method and equipment will be used for performing the <br />monitoring. <br />Double Wall tanks with Leak Alert LA -04 and Double Wall <br />product lines. <br />5. Describe the locations where the monitoring will be performed. <br />Liquid probes are installed at the annular space of the tanks <br />in conjunction with the annual line and leak detection system <br />certification. <br />6. List the name(s) and title(s) of the person(s) responsible for <br />performing the monitoring and®or maintaining the equipment. <br />James J. McCarthy - operator <br />Maintenance Department - Unocal <br />7. Reporting Format - Annual Inventory Reconciliation Report in <br />conjunction with annual monitoring system certification and <br />line integrity tightness testing. <br />8. State the Preventive maintenance schedule for the monitoring <br />equipment. Note: The maintenance schedule shall be in <br />accordance with the manufacturer's instructions. <br />Yearly service and maintenance work is recommended by the <br />manufacturer. <br />9. Describe the training needed for the operation of both the tank <br />system and the monitoring equipment. <br />The operator has been trained to properly operate the tank <br />monitoring system and receives periodic updates from <br />_environmental guidance specialist and Unocal service <br />contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.