Laserfiche WebLink
May. 9. 2017 4: 12PM Donlee Pump Co - No. 7237 P. 4 <br /> Secondary Containment Testing Repo arm-Page 3 of 5 <br /> F. Testing of Piping Sumps/Turbine Sumps p N/A(No pipinghurbine sumps) <br /> Test Method Developed 13y: ®Sump Manufacturer;❑Industry Standard; 1r;❑Other(Specify): <br /> Test Method'used:. ❑pressure; Q Vacuum; %Hydrostatic; ©Other(Spec): <br /> Test Equipment Used: Equipment Resolution: <br /> Sump#: ► - xjvy Sump#: Sump#: Sump#: <br /> Sump Diameter(inches): LAIg+°i re <br /> Sump Depth(inehes): HL4 it <br /> Sump Material: af vGCAk'45 <br /> Height From Tank Tdp to Top of Ir/lei est Pipe Penetration inches : Vi`' <br /> Height from Tank Top to Lowest <br /> Electrical Penetration(inches): I5" <br /> lPortian.of Sump Tested: 41, Vbpye Pon adq'V% <br /> C.Ifturbine shuts down when sump EWIA J!�N1A []VWA ❑X/A <br /> sensor detects liquid,specify <br /> minutes. minutes minutes. minutes. <br /> turbine shutdown res apse tiine. <br /> Wait time between applying <br /> pressure/vacuum/water and minutes. 45 minutes, minutes, minutes. <br /> stating test: <br /> Test Start Date/Time: 0,0 <br /> Initial Reading(Ra: _7� (,(eZ'SO <br /> Test End Date/Time: &40 W,t'?- <br /> Final Reading(RF): .(02-94 6 <br /> Change in heading(Rf—Py): a.wtoo a. al"d► <br /> PassMaii Ttweshold or Criteria: o•ooZov o,oo 2.oe; <br /> 'Fest Result: zPass; ❑]Mail Pass; ❑Fail ®Pass; Q pail ❑Pass; [)Fail <br /> Was leak detection sensor <br /> properly replaced and verified as E4—yes;®No; -'Yes;F1 No-, [I'Y'es;[I No; El'Yes;❑No; <br /> functional after d an ? n N/A(Not Removed) E]N/A(Not Removed) ❑NIA(Not Removed) E]N/A(Not Removed) <br /> G. "besting of Under-Dispenser Contaimeot (UDQ ❑NIA(No dispensers or no Y,OC) <br /> Test Method Developed By: ®UDC Manufacturer;L]Industry Standard-,NX>~)-Cl Other(Specify): <br /> Test Method Used: 0 Pressure; ❑Vacuum;14Hydrostatic; ❑Other(Sped): <br /> Test Equipment Used: Equipment Resolution: <br /> ,'Ay ° <br /> ti, <br /> TN-454-3!5 rv►vrv.nnidoes.org 42126/42 <br />