Laserfiche WebLink
May 12 14 09:16a Reliable Petroleum 2098458953 P.5 <br />RECEIVED <br />UST SYSTEM RETROFIT OR REPAIR ,AY 1 R 2014 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained b#-WIRONMENTAL <br />1. Site map enclosed? YES[] NO W/ HEALTH DEPARTMENT <br />2. Submit copies of [CC Service Technician andfor Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (if <br />adding piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />4. List of equipment to be used (Attach manufacturers specification sheets showing third -party approval): <br />