Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FORM40 <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />490.54a <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.54b <br />I. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />4. NO DISPENSERS ❑ 99. OTHER (Specify): <br />_ <br />PANEL MANUFACTURER: Veeder Root 490-55 MODEL #: TLS-350 490-56, <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-57 MODEL #(S): 794380-208 490-50- <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a. YES ❑ b. NO 490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a. YES ❑ b. NO 490"60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ®a. YES ❑ b. NO 490.62 <br />2. UDC CONSTRUCTION IS ® 1. SINGLE-WALLED ❑ 2. DOUBLE-WALLED 490-63 <br />IF DOUBLE WALLED: 490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY ❑-1. LIQUID [12. PRESSURE ❑ 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490-64b <br />VI rpERIODIC'SYST19mi:TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. (23 CCR 2644.IZ —� <br />— _---_------------------____-- <br />_ ____-______--___--_--- _ _-- —_ <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />® Alarm logs 490-68a [IVisual Inspection Records 490.68b ❑ Tank integrity testing results 490-689 <br />[ISIR testing results (and supporting documentation records). 490-68d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-68f ❑ Corrosion Protection 60-day logs 490-681; <br />® Equipment maintenance and calibration records. 490-68h <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69C <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-699 <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g <br />❑ OTHER (Specify): M69h, MA <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />➢ Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />-X.. COMMENTS/ADDITIONkLWORMATION. <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />Overfill Alarm Set at 90% <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME Sunny Bhuller 490-72 TITLE Owner 490-73 <br />NAME Deepa Rai 490-74 TITLE Manager 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />" XII::OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490.76 <br />DATE: 49°-n <br />�P ENTI '80- . T k w !O era r '-Ih acli wne a u g d Re r n ive orowner <br />490-70- <br />490-79 <br />PLICANT NAME (print): <br />APPLICANT TI LE: <br />UPCF UST -D (12/2007) 2/7 <br />