Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page I of 2) <br />TYPE OF ACTION M 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490.1 <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br />490-2 <br />)eck one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($)• <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME) Yosemite 76 #255417 <br />' <br />BUSINESS SITE ADDRESS 1700 East Yosemite Avenue 103' <br />CITY Manteca <br />104. <br />II. EQUIPMENT TESTING: AND PREVENTIVE MAINTENANCE. <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR §2632, 2634L2638_2641--- -_ <br />99. OTHER <br />490-36 <br />MONITORING EQUIPMENT IS SERVICED ® E ANNUALLY ❑ (Specify): <br />III. MONITORING LOCATIONS . <br />® I. NEW SITE PLOT PLANAIAP SUBMITTED WITH THIS PLAN. 112. SITE PLOT PLAN/MAP PREVIOUSLY SUBiiI[TI-ED. (23 CCR §2632, <br />2634)490-4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING ETHOD(S): <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ® a. DRY El b. LIQUID FILLED El c. PRESSURIZED [Id. UNDER VACUUM ------ <br />49-36 <br />Veeder Roota9a7-1 MODEL #: TLS -350 <br />PANEL MANUFACTURER:-- <br />- _- __--------- <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL #(S): 794380-420 <br />490-10 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO NIONITOR SINGLE WALL TANK($). (23 CCR §2643) <br />490.11 <br />PANEL MANUFACTURER: 490 12' MODEL #: <br />490-13 <br />fN-TANK PROBE MANUFACTURER: 490.14. MODEL #(S): _._._._------•-------••- <br />490 -Is <br />_--------------------- ____-..-_____------_..__-----•---------------- -------- - ------- ----------- ---------------_ <br />LEAK TEST FREQUENCY: Ela. CONTINUOUS [Ib. DAILY/NIGHTLY ❑ c. WEEKLY <br />490.16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />49x17 <br />PROGRAMMED TESTS: Ela. 0.1 g.p.h. El b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490-18 <br />490.19 <br />3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />440. <br />Lj 4. WEEKLY MANUAL TANK GAUGING (NITG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />490.21 <br />490-22 <br />F15. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />TEST FREQUENCY: [3a. ANNUALLY [Ib. BIENNIALLY [1 (Specify): c. OTHER490-24 <br />490-zs <br />490-26 <br />❑ 99. OTHER (Specify): <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD($) (Check all that apply) <br />® 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />49-29 <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED [-1c. PRESSURIZED ❑d. UNDER VACUUM <br />r-------- <br />490-3° <br />I MODEL #: TLS_35O <br />PANEL MANUFACTURER: Veeder Root_- - <br />44x31 <br />-- - -_- <br />------'---'---------- - - 490-32 t <br />LEAK SENSOR MANUFACTURER: Veeder Root 1 MODEL #(S): 794380-208 _ <br />ODE --___-.-__•-..-_ - <br />490-33 <br />---_ _ _-_--._- -- - <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO <br />49°'34 <br />FAILURE/DISCONNECTION OF THEMONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-35 <br />2. MECHANICAL LINE LEAK DETECTOR (1MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTEDX23 CCR I263) <br />490.36 <br />MLLD MANUFACTURER(S): Va orlesS 440-37 MODEL #(S): LD2000 <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />-----*------------- -- - - - - - <br />490-39 <br />-_ - - - - - -- --- - - -- -- _-- - - -. _ _-_--__ - <br />ELLD MANUFACTURER(S) 490 -00 I MODEL #(S): <br />--------- - <br />490-41 <br />--2 <br />---------- _ _-- - _- - --- - - - -- - - - - - - _- --_ _- - <br />- PROGRAMMED M LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />gP <br />49-42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES El b. NO <br />49°43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [Ia. YES 13b. NO <br />49044 <br />4. PIPE INTEGRITY TESTING 49045 <br />TEST FREQUENCY ❑ a. ANNUALLY ® b. EVERY 3 YEARS ❑ c. OTHER (Specify) 49046490.47 <br />5. VISUAL PIPE NIONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED` <br />49049 <br />• Allowed for -itoring, of unburied emergency enerator fuel piping oaiy per HSC §25281.5(b)(3) <br />r] - 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(a)(3)1. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO TILE TANK SYSTEM <br />"490-51 <br />440-52 <br />❑ 49. OT[IER (Specify) <br />ago -53 <br />UPCF UST -D (112007) <br />