Laserfiche WebLink
r_l <br />l_1 <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />490.54. <br />1. UDC `IONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.546 <br />1. CONTINUOUS ELECTRONIC MONITORING 112. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />d. NO DISPENSERS ❑ 99. OTHER (Specify): _ __ _ <br />_.. _----__-- _ - — -- <br />-__—__�---------------- -------__ _._ __ —_ — <br />490-55 <br />PANEL MANUFACTURER.: Veeder Root_ MODEL #: TLS -350 490.56. <br />-� <br />__— _ —__ _ _ _ _ — . <br />490-58 <br />LEAK SENSOR MANUFACTURER: Veeder Root 49.57 ! MODEL #(S)' 794380-208 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a. YES ❑ b. NO 490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a. YES ❑ b. NO 490-60' <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO 490-62 <br />2. UAC CONSTRUCTION IS ® 1. S[NGLE-WALLED F-12. DOUBLE -WALLED 490.63 <br />IF DOUBLE WALLED: <br />UDC INTERSTITIAL SPACE IS MONITORED BY: Fl_!. L[ UID ❑ 2. PRESSURE ❑ 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490.646 <br />VII:: PER IODIC'SYSTEM':TESTING . <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 40.65. <br />LEAK DETECTION LD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR26441) —� <br />_ <br />—_— _ .� <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br />® 3. SPILL BUCKETS ARE TESTED .aNNUALLi'. 490.67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />® Alarm logs 490.682 ❑ Visual Inspection Records 490.686 ❑ Tank integrity testing results 490.68c <br />❑ SIR testing results (and supporting documentation records). 49048d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-6&f ❑ Corrosion Protection 60 -day logs 490-68. <br />® Equipment maintenance and calibration records. 490.68h <br />IXr TR'AINING`. <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490.696 <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490.69e. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490•69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69S <br />❑ OTHER (Specify): M69h, M69i <br />This facility has a "Designated UST Operator' who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />• Operation of the UST systems in a manner consistent with the facility's best management practices <br />• The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />• The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />? Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />='X:;:COMMFNTSIADDITIONAL INFORMATION'. <br />Provide additional comments here or Indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />Overfill Alarm Set at 90% <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME Sunny Bhuller 490-72 TITLE Owner 490-73 <br />NAME Deepa Rai 490.74 TITLE Manager 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow -tip action. <br />•7 7XII::OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate <br />to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 <br />DATE: 49° 77 <br />490-78 <br />'PLICANT NAME (print): ? <br />°� <br />490-79 <br />LE: <br />APPLICANTP/Z<_5/I <br />-- <br />j� �-�t A , <br />Owner�iE'/K— <br />UPCF UST -D (12/2007) 217 <br />