Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page of <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: II © Pass O FaiE I 1 Q Pass 0 Fail 0 Pass n Fail � © Pass , 0 Fail �� <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Spill/Overfill Boxes tested with annual Monitoring System Certification. <br />Page 7 of 7 <br />