My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 11:52:51 AM
Creation date
6/3/2020 9:49:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Sensor Installation Installation Steps <br />Figure 17-2. Example Pressure Sensor Install - ISD Installation (with Vapor Flow Meter) <br />O Black <br />ii ii • <br />To i I Seal -off i i From <br />Pressure <br />Console i <br />i i i i Sensor <br />+ e White <br />i i t i <br />1/2" rigid �J <br />conduit <br />Epoxy sealed connections in a <br />isdevr.vrpsWir.eps weatherproof junction box <br />Figure 17-3. Field wiring Pressure Sensor - Observe Polarity <br />17-6 <br />ARB Approved IOM 17 - Pressure Sensor Installation Guide - Executive Orders VR -203 and VR -204 <br />— — — — — — — — — — — — — — — — — — — — — — <br />Base of dispenser cabinet <br />— — — — — <br />-, <br />1 <br />Pressure <br />Sensor -.-___ <br />Wrap rubber shim from <br />100 kit around sensor before Cable <br />inserting in clamp <br />— <br />—————— — — — — ———————— — — — — — - <br />_—Pressure <br />sensing <br />---------------- <br />/Vapor <br />return line <br />--------I <br />port <br />from dispenser <br />ISD Flow Meter <br />grip <br />�Jr <br />/Cord <br />Junction box <br />Cable <br />/ (customer <br />I <br />� <br />' <br />supplied) <br />1/4 " OD copper � <br />' � <br />J J <br />I <br />tube as required <br />12 <br />Cord grip <br />Pitch to drain 1/4" vertical <br />\ <br />Seal off <br />- per 12" horizontal_ - e _ _ _ _ _ _ _ _ _ _J_Vapr <br />return line <br />/(customer <br />supplied) - <br />\i I 2 it <br />ear valve <br />To of -------- <br />pedestal island <br />- - - - - - - - r <br />11 % <br />_--_._--_ <br />------------ <br />ConduittoTLS Console----------- <br />�0 <br />Flow Meter and PressureJ----------- Sensor <br />O °� C <br />4 2 `0athe <br />wiring <br />same conduit <br />can shareo <br />to console°O <br />(Observe <br />polarity!)0 <br />I G�C <br />° <br />2" or 3" common main vapor return line <br />L_. <br />— — _ _ _ — — — — —. _ — <br />_. — _ _ <br />ONumbers in circle refer to item numbers (kit components) in Table 1 <br />Figure 17-2. Example Pressure Sensor Install - ISD Installation (with Vapor Flow Meter) <br />O Black <br />ii ii • <br />To i I Seal -off i i From <br />Pressure <br />Console i <br />i i i i Sensor <br />+ e White <br />i i t i <br />1/2" rigid �J <br />conduit <br />Epoxy sealed connections in a <br />isdevr.vrpsWir.eps weatherproof junction box <br />Figure 17-3. Field wiring Pressure Sensor - Observe Polarity <br />17-6 <br />ARB Approved IOM 17 - Pressure Sensor Installation Guide - Executive Orders VR -203 and VR -204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.