Laserfiche WebLink
SWRCB, January 2002 <br />r.r i ►Y !► a ►Y t 11 V —141kTZE <br />1/0/7 <br />Pages 0177 <br />Test Method Developed By: 4 <br />_ 0 UDC Manufacturer <br />R Jndustry Standard 0 Professional Engineer <br />O Other (Spew) <br />Test Method Used: <br />Q Pressure <br />O Vacuum <br />9 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: INCON <br />TS—STS <br />Equipment Resolution: <br />.000in. <br />UDC # tt-Z <br />UDC # .3W <br />UDC #7 <br />- <br />UDC Manufacturer. <br />UDC Material; <br />t <br />UDC Depth. <br />36' <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />•• <br />/,.� <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion ofUDC Tested <br />1711 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />0 Yes 0 No ?�NA <br />0 Yes 0 No yNA <br />0 Yes 0 No 1 NA <br />0 Yes 0 No SNA <br />raduct and water ?° <br />Turbine shutdown response time <br />Is system programmed for fail- <br />Yes 0 No tSNA <br />0 Yes 0 No gNA <br />0 Yes DNo $[NA <br />0 Yes 0 N 8VA <br />safe shutdown? 0 <br />Was fail-safe verified to be <br />O erational?' <br />0 Yes ONO tXNA <br />Cl Yes 0 No SNA <br />(I Yes 0 No MlA <br />0 Yes 0 No )SNA <br />Wait time between applying <br />` <br />pressure/vacuum/water and <br />starting testM <br />t✓1OAl <br />irl <br />AU rrn <br />Test Start Time: <br />t !Srorjiu <br />Initial Readin (Ri <br />$, <br />,: <br />3s 2 <br />Test End Time: <br />2 UYP PA: 2 <br />2 .� M ' 2 <br />2 1,'2 <br />Z : �/ <br />Fina] Reading(RE): <br />.. <br />rc <br />.. <br />, fp1z <br />_Lk <br />Test Duration: <br />r1 n.,n yr <br />0 r <br />rtt ►� <br />Chane in Readin (RF -Rt : <br />r.)V <br />p►p/ <br />,trot .001 <br />s/1~a <br />Pasil Threshold or Criteria: <br />(9Q� f COL <br />I t <br />r�Z <br />; voZ <br />Test Result: <br />Pass 0 Pail <br />,ffi Pass 0 Fail <br />Pass 0 Fail <br />Pass 0 Fail <br />Was sensor removed for testing? <br />es 0 No 0 NA <br />Wes 0 No 0 NA <br />An 0 No 0 NA <br />es 0 No U NA <br />Was sensor properly replaced and <br />verified functional after testi ? <br />?Yes 0 No 0 NA <br />es 0 No 0 NA <br />ttTes O No 0 N <br />ArYes O No 0 NA <br />Comments — rnclude in formation an re airs made prior to testing, and recommended allow -u or ailed tests <br />' if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk M is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />