My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 11:52:51 AM
Creation date
6/3/2020 9:49:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />r.r i ►Y !► a ►Y t 11 V —141kTZE <br />1/0/7 <br />Pages 0177 <br />Test Method Developed By: 4 <br />_ 0 UDC Manufacturer <br />R Jndustry Standard 0 Professional Engineer <br />O Other (Spew) <br />Test Method Used: <br />Q Pressure <br />O Vacuum <br />9 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: INCON <br />TS—STS <br />Equipment Resolution: <br />.000in. <br />UDC # tt-Z <br />UDC # .3W <br />UDC #7 <br />- <br />UDC Manufacturer. <br />UDC Material; <br />t <br />UDC Depth. <br />36' <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />•• <br />/,.� <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion ofUDC Tested <br />1711 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />0 Yes 0 No ?�NA <br />0 Yes 0 No yNA <br />0 Yes 0 No 1 NA <br />0 Yes 0 No SNA <br />raduct and water ?° <br />Turbine shutdown response time <br />Is system programmed for fail- <br />Yes 0 No tSNA <br />0 Yes 0 No gNA <br />0 Yes DNo $[NA <br />0 Yes 0 N 8VA <br />safe shutdown? 0 <br />Was fail-safe verified to be <br />O erational?' <br />0 Yes ONO tXNA <br />Cl Yes 0 No SNA <br />(I Yes 0 No MlA <br />0 Yes 0 No )SNA <br />Wait time between applying <br />` <br />pressure/vacuum/water and <br />starting testM <br />t✓1OAl <br />irl <br />AU rrn <br />Test Start Time: <br />t !Srorjiu <br />Initial Readin (Ri <br />$, <br />,: <br />3s 2 <br />Test End Time: <br />2 UYP PA: 2 <br />2 .� M ' 2 <br />2 1,'2 <br />Z : �/ <br />Fina] Reading(RE): <br />.. <br />rc <br />.. <br />, fp1z <br />_Lk <br />Test Duration: <br />r1 n.,n yr <br />0 r <br />rtt ►� <br />Chane in Readin (RF -Rt : <br />r.)V <br />p►p/ <br />,trot .001 <br />s/1~a <br />Pasil Threshold or Criteria: <br />(9Q� f COL <br />I t <br />r�Z <br />; voZ <br />Test Result: <br />Pass 0 Pail <br />,ffi Pass 0 Fail <br />Pass 0 Fail <br />Pass 0 Fail <br />Was sensor removed for testing? <br />es 0 No 0 NA <br />Wes 0 No 0 NA <br />An 0 No 0 NA <br />es 0 No U NA <br />Was sensor properly replaced and <br />verified functional after testi ? <br />?Yes 0 No 0 NA <br />es 0 No 0 NA <br />ttTes O No 0 N <br />ArYes O No 0 NA <br />Comments — rnclude in formation an re airs made prior to testing, and recommended allow -u or ailed tests <br />' if the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk M is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.