My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1986-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:40:23 PM
Creation date
6/3/2020 9:49:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1995
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1986-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTEFILY INVENTORY AEPORTING <br />Facility Name: Z <br />Facility Address: <br />City: <br />County: &149a-z4Z <br />State: <br />These were inventory variations that I hereby certify that all product level variations <br />0 exceeded the allowable limits for this El for the above mentioned facility were <br />quarter. within allowable limits for this quarter. <br />LIST DATE, TANK # AND AMOUNT FOR ALL VARIATIONS <br />THAT EXCEED THE ALLOWABLE LIMITS. <br />OUT OF TOLERANCE <br />INVESTIGATIVE STEPS <br />Step 1 Review Records. <br />Step 2 New reconciliation <br />performed. <br />Step 3 <br />Explanation <br />Step 4 <br />Records review from <br />the last stable <br />situation. <br />Step 5 <br />Physical facilities <br />inspected for leaks. <br />Step 6 <br />Dispenser meters <br />calibrated. <br />Step 7 <br />Piping hydrostatically <br />tested. <br />Step 8 <br />Underground storage <br />OUT OF TOLERANCE <br />INVESTIGATIVE STEPS <br />Step 1 Review Records. <br />Step 2 New reconciliation <br />This quarterly summary report <br />shall be submitted within 15 days <br />after the end of each quarter. Check <br />the quarter you are submitting <br />El Quarter 1 — January thru March <br />Submit by April 15 <br />Quarter 2 — April thru June <br />Submit by July 15 <br />❑ Quarter 3 — July thru September <br />Submit by October 15 <br />0 Quarter 4 — October thru December <br />by January io <br />performed. <br />Step 3 <br />Shell Oil notified. <br />Step 4 <br />Records review from <br />the last stable <br />situation. <br />Step 5 <br />Physical facilities <br />inspected for leaks. <br />Step 6 <br />Dispenser meters <br />calibrated. <br />Step 7 <br />Piping hydrostatically <br />tested. <br />Step 8 <br />Underground storage <br />tanks precision tested. <br />Step 9 <br />Additional investigatior <br />as required by Shell <br />or the local agency. <br />This quarterly summary report <br />shall be submitted within 15 days <br />after the end of each quarter. Check <br />the quarter you are submitting <br />El Quarter 1 — January thru March <br />Submit by April 15 <br />Quarter 2 — April thru June <br />Submit by July 15 <br />❑ Quarter 3 — July thru September <br />Submit by October 15 <br />0 Quarter 4 — October thru December <br />by January io <br />
The URL can be used to link to this page
Your browser does not support the video tag.