Laserfiche WebLink
10/19/2003 16:22 4089710135 SSS INC PAGE 05 <br /> 0 0 <br /> Monitoring system Certification <br /> UST Monitoring Site Plan <br /> 341 E. Main St. @ Hwy. 99 in Ripon <br /> 08/21103 <br /> . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . _ . . . . . <br /> . . . _ . • . . . . . . . . . . <br /> . _ . . . . . . . . . . . . . . . . . . <br /> . _ . . . . _ . . . <br /> . . . . . . . <br /> � . . . . . . . . . . . . . . <br /> . . . . . . . <br /> _ . . . . . _ . . . . . <br /> Date map was drawn: <br /> Instructions <br /> On your site plan, show the general layout of tanks and piping. Clearly identify locations of tho following equipment, if <br /> installed:monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br /> Containers, or other se(;Q11ddry containment areas; meehaniool or electronic line leak detr_dtors; anti in-tank liquid <br /> level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />