My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO MENTAL HEALTitDEPARTMENT <br /> °U SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran R.E.H.S. 304 East Weber Avenue, Third Floor g <br /> Carl Bor man,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 <br /> Douglas W.Wilson,R.E.H.S. <br /> Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> i F o R Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> October 15,2003 <br /> Service Station Systems <br /> 680 Quinn Avenue <br /> San Jose, CA 95112 <br /> Re: Ripon Shell,341 E. Main Street,Ripon CA <br /> The permit application to replace the direct bury spill containment on the premium 91 <br /> and drop tubes with overfill flapper on the premium 91 and unleaded 87 underground <br /> storage tank system from the above referenced facility has been approved with the <br /> following conditions: <br /> 1. Contact the San Joaquin Valley Air Pollution Control District and local Fire <br /> Department for all necessary permits if applicable. <br /> 2. The installation must follow the manufacturers instructions. <br /> 3. EHD must witness a measurement of the drop tube to determine 95% shutoff for <br /> overfill protection. <br /> 4. EHD must witness the testing of the spill containment with product before <br /> backfilling may occur. <br /> 5. All metal parts of the risers must be verified by EHD to have corrosion protection. <br /> 6. A tank tightness test must be performed after concrete has been poured and the <br /> results must be received within 10 days of testing. <br /> 7. Annual spill containment testing (Health and Safety Code §25284.2) must be <br /> performed by 12/31/03. <br /> 8. A site health and safety plan must be available onsite for review during <br /> construction. <br /> Schedule all appointments 48 hours in advance. <br /> This permit expires on 1/15/04. <br /> If you have any questions please contact me at (209)468-9848. <br /> Thank you, <br /> Ray von FlUe, R.E.H.S. <br /> Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.