My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
responsible party shall contact all water purveyors, industrial sites and private properties known or <br /> suspected to operate wells in the area and secure the locations of all water supply wells in the area. Please <br /> include prints of historic aerial photos used as part of your study,and use data tables and maps to report the <br /> data collected as part of your survey. <br /> Please note that it is your responsibility as the discharger to protect and notify consumers of <br /> potential water quality issues related to this release. <br /> In the event elevated and variable MTBE concentrations are observed we request that you immediately <br /> characterize the ongoing sources of dissolved phase MTBE contamination at your site. Please report the <br /> results of your characterization in the SWI Report and evaluate cost effective clean up methods during the <br /> SWI phase. We also request that you perform a tank system tightness test and visually inspect all <br /> underground storage tank (UST) sumps and other appurtenances to determine if your UST system is <br /> currently leaking. Please determine (1) the approximate time frame of the MTBE/Additives release first <br /> occurring at your site; (2) the use history of MTBE/Additives at your site; and (3) the history of all <br /> unauthorized releases and spills at your site. Report your findings in the SWI Report requested below. <br /> Additionally, if you have any MTBE, other fuel additives, or any other data previously collected at your <br /> site that has not been submitted to PHS/EHD, you are requested to submit this data immediately and <br /> update cumulative data tables accordingly. <br /> We request that you monitor the groundwater contaminant plumes on a quarterly basis. Additional <br /> wells will be required to define the extent of the plume if it continues to migrate. Please discuss the results <br /> of your plume monitoring in your Quarterly Reports. In the event continued plume migration is identified, <br /> please include recommendations for the installation of additional wells and cost effective remediation <br /> strategies in the Quarterly Reports requested below. <br /> Please submit technical reports to the San Joaquin County Public Health Services Environmental Health <br /> Division(PHS/EHD),Attention: Ron Rowe, according to the following schedule: <br /> • 30 days from date of this letter-Work Plan Addendum for completion of SWI <br /> • 45 days from work plan submittal-Soil and Water Investigation(SWI)Report <br /> • 210 days from work plan submittal-Corrective Action Plan <br /> We request that all required work be performed in a prompt and timely manner under the direct supervision <br /> (witnessed)of PHS/EHD staff. We have proposed a schedule for the submittal of the SWI Report and the <br /> CAP. Revisions to the proposed schedule shall be requested in writing with appropriate justification for <br /> anticipated delays. <br /> PHS/EHD directs you as responsible party to comply with the above directives and submittal of a <br /> written work plan for review no later than thirty days from the date of this letter. <br /> Should you have questions regarding this correspondence please contact Ron Rowe at(209)468-0342. <br /> Donna Heran,RENS,Director <br /> Environmental Health Division <br /> Ronald Rowe,Sr.REHS Margaret L gorio, Supervisor <br /> Site Mitigation Unit Site Mitigation Unit <br /> CC: PHS/EHD UST Unit-Doug Wilson <br /> CITY of RIPON-Dale Ramey RWR/341shell <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.