My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> * HAZARDOUS MATERIAL MANAGEMENT PLAN <br /> DEALER: Dave Posey Equilon Enterprises, LLC <br /> BUSINESS NAME: Ripon Shell P.O. BOX 8080 <br /> STREET: 341 E. Main Street MARTINEZ, CA 94553 <br /> CITY: Ripon <br /> WIC No: 6522-0356 <br /> DESCRIPTION <br /> RETAIL SALES OF GASOLINE AND RELATED PETROLEUM PRODUCTS. <br /> DESCRIPTION OF THE UNDERGROUND TANKS ARE AS FOLLOWS: <br /> No. of SIZE MATERIAL CONST. <br /> TANKS (gal) (STL/FG) (SW/DW) <br /> FormulaShell Regular 1 15000 FG DW <br /> FormulaShell Premium 1 15000 FG DW <br /> FormulaShell Plus <br /> Diesel <br /> Waste Oil Tank <br /> PRODUCT LINES: <br /> MATERIAL: FG <br /> CONSTRUCTION: DOUBLE WALL <br /> All product lines are pressurized using a submerged pumping system. <br /> Impact valves under each dispenser are also inspected annually to assure closure. <br /> Repair and/or replacement of all leak detectors and impact valves will be done annually at the time of inspection and retested <br /> to meet the above test conditions. <br /> *This document is to be kept current and placed in the Safety, health&Environmental "Green Book" maintained at the site. <br /> (revision 05/13/98) <br />
The URL can be used to link to this page
Your browser does not support the video tag.