Laserfiche WebLink
SWRCB, January 2002 <br />ti <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run# <br />Piping Run# <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />90, <br />90, <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />10:50 <br />10:50 <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />Test End Time: <br />11:50 <br />11:50 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: <br />X Pass ❑ Fail <br />X Pass []Fail <br />Pass ❑ Fail <br />Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />