Laserfiche WebLink
SW RCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br />�� i, ^#n ,du* -�#,2v��t3 NR..Uu,.nta#, . a z <br />i�n.n., Rk:uY n#t. <br />RunR <br />�.P�i 1 Pv iP m Piping Piping <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />Y <br />3" <br />Length of Piping Run: <br />90' <br />90' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#I <br />Test boot at STP#2 <br />Wait time between applying <br />pressure and startin test: <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />10:50 <br />10:50 <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />Test End Time: <br />11:50 <br />11:50 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />l Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No LL ' PSI <br />No Loss in PSI <br />Test Result: <br />X Pas ❑ Fail <br />X Pass ❑Fail Pass ❑ Fail <br />Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />