Laserfiche WebLink
S'WRCB, January 2002 Page I of�_ <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Equipment Resolution: <br />' + d� U'�51"^ ,�. <br />f {E_ _tb"Y' s , $ r e • v `+'ts' <br />•.,M <br />MEMO=. .z. <br />c <br />P� <br />ill <br />S Box # <br />ill <br />S Box # Sill Box # <br />P� p <br />Spill Box # <br />P <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />