Laserfiche WebLink
Page P CDEH,August 2003 P ag of---- <br /> 4. TANK <br /> Test Method Developed By: 0 Tank N huw x Industry Standard 0 Professional Engineer <br /> ❑ ) <br /> ® Test Method Used: 0 Pressure xvacmam Hydrostatic <br /> ❑Other(Spe4) <br /> ) <br /> Test Equilpment Used.0-30"Hg Vacuum Gauge Equipment Resolution:V2" <br /> Tank# Taok# L Tank# Tank# <br /> Is Tank Exempt From Testing?' es ❑ Kyes 0 No 0 Yes ❑No 0 Yes ❑No <br /> Tank Capacity: d <br /> Tank Material: <br /> Tank Manufiwturw. <br /> Product Stored. <br /> Wait time between dying <br /> pressure/vacuum/water and <br /> qq!:tiqA test: <br /> Test Start Time: <br /> Initial R (Rr): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ra): <br /> Pass/Fail Threshold or Criteria. <br /> Test 0 0: ® D;Fali fl ftu 0 Fail 0 Pass 0 Fail <br /> ® Was sensor removed for testing? 0 Yes 0 No a A ❑Yes 0 No 0 NA 0 Yes 0 No 0 NA ❑Yes ❑No 0 NA <br /> Was sensor properly replaced and 0 Yes ❑No 0 A 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No ❑NA <br /> verified fimetional after <br /> Co entts— include ' ormanon on r muds' to twWm and recommended of - for failed tests <br /> �} <br /> r <br /> new— <br /> Secondary the conamm automatically monitors both the primary and secondary <br /> conWnment,such as systems that are hydrosWdcally or under constmat vacuum,are exempt from periodic containment <br /> testing. {California Code of RegdWons,Title 23, 2537(aX6)) <br />