Laserfiche WebLink
s <br /> VacuTecg <br /> I S.O. # 077319 <br /> r TECHNOLOGY FOR TANKS <br /> ANOTHEM ENT <br /> Date 11/12/92 <br /> caner EXXON-ESCALON MINI MART Site # i <br /> Phone <209> 383-1546 <br /> Invoice Name/Address EXXON-ESCALON MINI MART 1097 EAST YOSEMITE AVENUE ESCALON, CA 95320 <br /> Attn: RANDY ROSE <br /> Site Name/Address EXXON-ESCALON MINI MART 1097 E YOSEMITE AVE ESCALAN, CA <br /> TANKS LINES Leak Det <br /> See Ullage TANKS and LINES Tested to CFR-40 Parts <br /> see Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280.281 &NFPA 329 Specs. <br /> For Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> L� Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested Other: <br /> Tank Tank FRP/ START START START or ST/ START END or or & <br /> Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPIs Fail NONE PASS <br /> 1 REG -7000-0 lameter 0 .0 0 0 00 9 4 . 0 0 00 .160 N N N T lA ST PS 2:0 0 12:30 0.000 ''111 P N Exist LD SN/MDL/MFG: 2 019 2-0 9 2 6 <br /> UNL 120 )0 . 000 094 . 00 00 . 160 New LD SN/MDL/MFG: <br /> arena 18 : 03 Tim of OTe <br /> t C at 7 8 . 0 Mf m. TOK H I EM LINE TES PSI 50 . 00 <br /> Start Time: <br /> T 2 2 0 Tast 1:- Entbe: nc urometer+ Dspenser Shear Valves <br /> End Time: Operate hes/no <br /> 2 SUPR 10000 tameter 0, 000 1104 . 0( 0 0 .16 01 N N I Y F 2A ST PS 3 : 00 3: 30 0.000 r P N E-tLE)SN,MDUMFG: 40187-8943 <br /> UNL t ry® 0 . 0 0 0 10 4 . 0 0 00 . 1601 New LD SN/MDUMFG: <br /> arena StartT me: 18 : 0 3 T me of Test 11 at 87 . 0 Mff Op T O K H I EM LINE TEST PSI 50 . 00 <br /> an be nc urometer Dis49enser Shear Valves <br /> End Time: Test PSI:- Ent D revs: t O rate I es/nol <br /> 3 NO 10000 tameter J 0.000 095. 00 00 .160 N N N T 3A ST PS 16:00 6 : 30 0 .000 T P N Exist LDSN/MDUMFG: 20191-3239 <br /> LEAD 12 0 0 . 0 0 0 0 9 5. 0( O O • 1 6 0 New LD SN/MDL/MFG: <br /> PLUS arena Start Time: 22 : 3 6 Time of Test ji at 79 .0 MI. TOK H I EM Dsp TEST PSI 5® ® ® <br /> an be nc inomet Dispenser Shear valves <br /> End Ti T 1'- Ent r s: O .rate 1 es/no <br /> lameterEst LD SN/MDUMFG: <br /> I I -+ New LD SN.'NIDUMFG: <br /> -M-at-eriall Percent of Fillatump <br /> Start Time: Time of Test: Mf .. LINE TEST PSI <br /> an O Inclinometer Dispense+Shear Valves <br /> End i Test 1: Entry: r operate f es/no <br /> Diameter Exist LD SN/MDL/MFG: <br /> New LD SN/MDL/MFG- <br /> atena rcent o LINE TEST PSI: <br /> t al ump <br /> Start Time: Time of Test: <br /> an O Inclinometer <br /> D�Spenser Shear Valves <br /> End Time: Test I' Entry: r O rate t eslno <br /> tameter -. Exist LD SN/MDUMFG: <br /> New LD SN/MDUMFG: <br /> Materialrcent o I at ump LINE TEST PSI: <br /> Start Time: Time of Test: MI,.: .. <br /> an r0 nC InOmeter Dispenstt Shear Valves <br /> nd Ti T is nt O rate es/no <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN REGION Unit* 017 State Lic. # State: CA 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on fila (800) 888-8563 ® FAX (713) 690-2255 <br /> TAK-01 <br />