Laserfiche WebLink
Memorandum <br /> To: NICOLE—WESTSTAR ENVIORNMENTAL <br /> CC: [Click here and type name] <br /> From: DOUG WILSON, SUPERVISING REHS <br /> Date: September 17, 1998 <br /> Re: FINAL INSPECTION FOR 1097 MAIN,ESCALON <br /> ENCLOSED IS A INSPECTION CHECK OFF SHEET WE USE FOR FINAL INSPECTIONS OF <br /> NEW UST FACILITIES. DUE TO THE FACT THAT THERE HAS BEEN AT LEAST 4 FINAL <br /> INSPECTIONS BY EHD THAT FOUND THAT THE EQUIPMENT WAS NOT OPERATIONAL. <br /> PLEASE HAVE THE INSTALLERS CHECK EACH OF THE ITEMS(13 TO 23). THESE ARE <br /> THE ITEMS THAT HAVE TO OPERATIONAL OR WE WILL NOT FINAL THE JOB. CHECK <br /> OFF THESE ITEMS AND SIGN THAT THEY HAVE BEEN CHECKED AND FAX IT BACK TO <br /> MEAT 468-3433 AND I WILL SET A TIME FOR A FINAL INSPECTION. <br /> I HAVE ALSO ENCLOSED A COPY OF THE ITEMS THAT ARE PART OF THE APPROVAL <br /> OF THIS SYSTEM INCLUDING THE LEAK DETECTORS. <br /> DOUG WILSON <br /> gg <br /> 1 <br />