Laserfiche WebLink
07/09/98 18:10 FAX 713 690 7786 Reran FPG Exec - DDI <br /> A%At <br /> AWRONre,e <br /> ( +" 7 INTERNATIONAL <br /> FmEmAss Pim OP <br /> GroW He&dqw"era <br /> 5301!Hollister,Sidle 111 <br /> Houston Tem 77040 <br /> Telephone: 71316'301-'7777 <br /> Fax 713!8 2 <br /> July 9, 1.99 <br /> Robert c lellon Via 1"Class Mail <br /> Environmental cal d Facsiruile <br /> San Joaquin Co (209) -013 <br /> 304 East Weber <br /> Stockton, California 95202 <br /> an UL Fiberglass Pipe System InstdIation <br /> Escalon Nfini Mart Project <br /> DecCle on: <br /> On September 18, 1947,John Mendrinbe i of Westar Environmental, Inc. attended <br /> an Bron installation training class held at the Fresno office of Shields, Harper & Company. <br /> The specific product on which they were trained and issued Certificates of Completion for was <br /> Ameron Dualoy 3000/LCX coaxial piping system. <br /> The product being installed on the subject job is 2" and 3" Ameron Dualoy 3000/L single wall <br /> primary piping system(no double wall pipe or clamshell s)for the vent and vapor lines. <br /> As the installation and testing of the primary pipe portion of our 3000ILCX system is exactly the <br /> same as it is for the single wall primary portion of our 3000/L is letter will serve as an <br /> amendment to es 's Certificate of Completion of Installation Training for the single ll <br /> primary portion o y of Dualoy 3000/L. <br /> Please feel free to contact me if there are any additional questions, <br /> Sincerely, <br /> J. <br /> Mark 1®Nowak <br /> National Sales Manager <br /> MJN/vo <br /> cc. Peter Sokoloff, Sunbelt Industries <br /> (Ameron U Rep-Cal rrza) <br />