Laserfiche WebLink
-,7-08-1998 8:40AM FROMLLSTAR/WESTSTAP 2092770106 P- 2 <br /> JUL-eG 98 10:06 FROM.APIERON WSWER SRUC TO:2A106 PAGE.-Ol <br /> A%A <br /> AMFJWN <br /> INTILIMMONAL <br /> IFURWAMSPInc"s. <br /> 08 July 1990, F1bcWA%kpc Divison AmWrAs <br /> IM4 Amefth Rhod,pa&Z W* <br /> 001-kbaffiM-kaw 7 <br /> Mr. John Mendrin <br /> Mr. Alberto ENaz <br /> Westar Environmental, Inc- <br /> 4658 WOO Jennifer <br /> suite 101 <br /> Fresno. GA 93722 <br /> RF— Ameron UL Fiber"as Piping System <br /> installation Carlificate <br /> Escalun Mini Mart Project <br /> Door Messrs, Mend(in and Diaz: <br /> On September 18, 1997, you both attenaed an Ameron Installation training Glass held <br /> at the Fresno office of Shields, Harper& Company. The specific product on which <br /> you were trained and wore issued Cortificates of Completion was Amemn Dualoy <br /> 3000ILCX coaxial piping system. <br /> The product you are installing on the subject job is 2" and 311 Ameron Dualoy 3000/1. <br /> single wall primary piping system (no double vmll pipe or ciarnshel fittings) for the vent <br /> ancl vapor lines. <br /> As the installation and testing of Vie primary pipe portion of our 3000/LCX Fystem is <br /> exactly the same as it is for the single wall primary portion of our 30001L system, this <br /> letter will serve as a Certiftate of Completion of Installation Training for the single all <br /> primary portion only of Dualoy 300/L. <br /> Sincerely. <br /> \,A YWZ <br /> Mark Nowak <br /> National Sales Manager <br /> Ameron Fiberglass Pipe Group <br /> cc: Peter Sokoloff - Sunbeft Industfies <br /> Ameron UL Rep. Caftmin <br /> MN.'md <br />