Laserfiche WebLink
7-08-1998 8:37AM FROM , LSTAR/WESTSTAR 2092770106 P. 2 <br /> JUL-08 98 10.06 FROM:AMERON CUSTOWSRVC TO:2M92T4 PfCE:01 <br /> A%A <br /> AMERON <br /> 119750NAT19PAL <br /> Ft Mss PM Cwvvr <br /> 08 July im ribm"Ppu otv-wn 4mciic,p <br /> UM Ammm%nod.PO wx pa <br /> 8UrkbW1M6'1LCA4&701.4 <br /> Mr. John Mendrin Tewp"WW."' 015W-14TI <br /> Fix nulawn" <br /> Mr. Alberto Diaz <br /> Wester Environmental, Inc. <br /> 4668 West Jennifer <br /> Suite 101 <br /> Fresno. CA 93722 <br /> RE, Ama UL Fiberglass Piping System <br /> installation Cortirmate <br /> Escalon Mini Mart Project <br /> Door Messrs. Mendrin and Diaz: <br /> On September 18, 1997, you both attended an Ameron installation training class hold <br /> at the Fresno office of Shields, Harper & Company. The specific product On which <br /> you were trained and were issued Certificates of Completion was Am Dualoy <br /> 3MILCX coaxial piping system. <br /> The product you are installing on the subject job is 2" and 3"Ameron Dualoy 300011- <br /> single wall primary piping system (no double wall pipe or clarnsholl fittings) fort vent <br /> and vapor lines. <br /> As the installation and testing of the primary pipe portion of our 30001LCX system is <br /> exactly the same as It is for the single wall primary portion of our 300011- system. this <br /> letter will serve as a Certificate of Completion of Installation Training for the single wall <br /> primary portion only of Dualoy 3001L. <br /> Sincerely, <br /> Mark Nowak <br /> National Sales Manager <br /> Ameron Fiberglass Pipe Group <br /> cc: Poter Sokoloff- Sunbelt industries <br /> Arrieron UL Rep. California <br /> MN.-md *Dow <br />