Laserfiche WebLink
07/02/1998 15:16 7142898184 SUNBELT INDUSTRIES PAGE 02 <br /> INSTALLATIONFIBERGLASS PIPING SYSTEMS <br /> FOR UNDERGROUND PETROLEUM PIPE <br /> q (Please review the important Notice section on page 2 before completing) <br /> A. Owner J Operator(please print&sign name) <br /> 1. job Site Address <br /> 2. job Site Representative(print) (tsgru ) <br /> 8. Installation Contractor <br /> I. Job Site Foreman(print) ( ) <br /> C- Installation Dates) <br /> D. Pipe Manufacturer_ <br /> To be Initialled By: <br /> E. PRE-INSTALLATION CHECK Undicate daft vedfied 4ftr each item Installers Owner/Operator's <br /> I. butaller bhall show evil / is: Foreman Representative <br /> a. Ucensed or certified by the state implementing agency,or <br /> b. Trained by the pipe manufacturer. <br /> 2. Installer has current c 'a Installation instructions. <br /> a. Instructions dated <br /> b. Installatim manual number <br /> 3. Pipe&fittings have UL(U )or ULC <br /> (Underwriters'L of )Label. <br /> 4. Proper tools and adhesive available par manuWww's instructions, <br /> 5. Pipe&fittings inspection: <br /> a. Impact or puncture...CutoutSeefootnote(I)forrapaim <br /> b. Damaged tapers...Cutoff and maper. <br /> c. Check bonding surfaces for ultraviolet weathering degradistion. <br /> 6. Trench <br /> a. Allow for mintmurn of 6"beddhV material. <br /> b. Have required a 's <br /> C. Width: Allow for 4°'minimum <br /> pipes and 6" <br /> 7. Approved backfill native w°) <br /> a. Clean washed aamd,or <br /> b. Pea gravel-1/8"to 3/V'parfida sin,at <br /> C. Refer to footnote(1)for other buM materials. <br /> F. INSTALLATION PROCEDURES le varifted afte each item) <br /> 1_ 6'o£approved bedding mate". <br /> 2. Dry Fit system prior to adhesive bonding. See footnote(1) <br /> 3. Heat assist required for adhesive curing when <br /> temperature is below 707(21`C). <br /> 4. Use fle4ble connector ora minhaunt C straight ruts of FRP pipe <br /> (per API 1615)at MP pipe terminations. <br /> 5. A minimum sepwation of 4"between pipe rum,and 2 1/2"on crowavus. <br /> 6. ding/backfill supports pipe completely an runs and crossovers. <br /> 7. Minimum of 6'approved badtfill cover mitterial or <br /> more as ftluired by local authorism <br /> S. If surface is unpaved,a minimum of W of badclill is <br /> G. INSPECTION AND TESTING(Indicate dam vaffitil after each item) <br /> 1. Joint inspection <br /> a. Cocked joints(misaligned ),See kxftote(2) <br /> b. Joint back-off. See fop (2) <br /> c. Check for proper cure of adhavive ban& See aftedve kit Instructions. <br /> f 2. Test system in ace Ince with NFPA 30 or local <br /> requirements. See footnote(3) <br /> 3. Secondary containment piping. See footnote(1) <br /> Prepared by: Fiberglass Petroleum Tank&Pipe Institute,9801 Westhelater,Suite 606, Houston,Texas 77042-3951 <br /> Phone:713-465-3310 Fax W-46346" <br />