Laserfiche WebLink
0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE Erl.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one idem only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1' <br /> BUSINESS NAME(Same as Racili Name or DBA) 3. <br /> o <br /> BUSINESS SITE ADDS loa. CITY c l� <br /> r i J f 0 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by theequipment_manufacturers'instructions,or annually,whichever is ore frequent. Such work must be performed by qualified personnel.[23 CCR§2632 2634.2638,26at[ <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY El99.OTHERcif 490-3a <br /> (Spe y): 490-3b. <br /> IIL.MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 4904 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (at hck`ll <br /> t <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) a90-s. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632.26341 / <br /> SECONDARY CONTAINMENT IS: a.DRY [Ib.LIQUID FILLED EK PRESSURIZED ❑ d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: o j f q 7LJ 490- 7, MODEL#: ! !0 490-8. <br /> LEAK SENSOR MANUFACTURER: 490-9- MODEL#(S): ,_ 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER490-t7. <br /> (Specify): <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. c.OTHERS cif 490 18. <br /> g-p -----.__----g=p----- -®-----.._.. Pe Y..)_:_. ago-lv. <br /> El3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR§2646.11 490-M <br /> 4.WEEKLY MANUAL TANK GAUGING MTG 23 CCR§2645 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 422. <br /> ❑ ( )[ I 49490- <br /> ..----------------- ---------------------------------------- -----.....___._._�..----...__-------------------._.... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§zr>a3.11 ago-z3. <br /> TEST FRE QUENCY: El a. b.BIENNIALLY Ela. c.OTHER_(.S y�' 490-2 <br /> cif 42 <br /> --._� _490-25,490-24 <br /> ,_._....... <br /> - a HI-26. <br /> ❑ 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (check all <br /> that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> 123 CCR SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED [mac.PRESSURIZED ❑ d.UNDER VACUUM 490-22 <br /> §26361 <br /> PANEL MANUFACTURER: <E'g t, �-J.- 16 (q/ 490-30. MODEL#: ,?o 400-31. <br /> LEAK SENSOR MANUFACTURER: 6P 490-32 MODEL#(S): 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ET a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. YES ❑ b.NO 490-35. <br /> ❑ 2 MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49036, <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> 490-37. MODEL#S 490-38. <br /> MLLD MANUFACTURER(S): �)__ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 49040. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: F1a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. C3 a.YES [:] b.NO 490-44. <br /> -----.._.-._._....___-__.._.._._.._...- - <br /> ---..--_...---- - ---- ---- --- ------- <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045, <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS cif 49046. <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 49049. <br /> _--_"Allowed for mom torin-of mburied_emergencv generator fuel pipingonlvper HSC?t25281-5(b)(3)_F1 6.6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§2636(a)(3)1 490-50 <br /> ElT NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,C14APTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-5 1 <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidoes.org <br />