Laserfiche WebLink
Nov. 14: _2 0 0 6: _4.4 9 P Mg i n t�S t a r E n v i r o n m e n t a l, Inc. eck this bo k gaugi N o- 15 5 9(on1 P __4 inventory control <br /> p Check this boJVo tank gauging or Silt equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> M Yes D No's tlas mpRt wiring been inspected or proper entry and termination,me ading testing for grounaizw­ <br /> rM <br /> Yes 0 NW Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®'Vis Nor Was accuracy of system product level readings tested? <br /> —Yes No- as accuracy of system water level readings tested? <br /> Yes LLI No° Were all probes reinstalled propSil ? <br /> 10 Yes NO* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> G. Line Leak Detectors (LLD): C] Check this box if LLDs are not installed. <br /> Com tete the followinR checklist: <br /> ® Yes 113❑NO* For equipment star-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> NIA (Check av*a airly)Simulated leak rare:® 3 g p.h.; ❑0.1&p1. 0.2 g ph <br /> Q NO Were allLLDs confirmed operational and accurate within regulatory requirements? <br /> Yes Noy I Was the testing apparatus ro calibrated? <br /> ®Yes ° For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ❑Yes Q NSA For electronic LLDs,does the turbine automatically shut off if the LH}detects a leak? <br /> ❑ yes NO* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disable( <br /> N/A I or disconnected? <br /> yes N/o,A*, For el 'c LLDs, the ' auto y off if any portion of the m 'to ' systemm ion; <br /> Of fails a t ? <br /> Yes j <br /> NSA For electronic LLDs,have all accessible g connections been visually inspected? <br /> 19 Yes No• Were A items on the equipment manufachktFs maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected, <br /> H. Comments: <br /> Page 3 of 4 03101 <br />