Laserfiche WebLink
' . <br /> ` Nov' 15. 2~805 0� 58AM WeO Star Envimnmental. Tnc No. 3742 P. 4 <br /> Page 3of8 / RC;,January 2OO2 0 <br /> S. SECONDARY PIPE TESTING <br /> Test Metbod Developed By: Pip ing Manufacturer Bidustry Standard Professional EngineerOther(Specify) CSWRB <br /> Method Used: Pressure Vacuum Hydrostatic <br /> _Ye_si`6'u_ip"merit Used: RAPID CONTROLS BOX, MTS PRO13E Equipment-, <br /> .002 <br /> Piping Ran#87 Piping Rui,m#91 Piping Ron# Piping Run 9 <br /> Piping Manufacturer, Iflex flex <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run, 50, 50' <br /> Pr6du.ct Stored-, gasoline <br /> Method and location of <br /> piping-run isolation <br /> pressuze/vacuum/water and <br /> starting test: 30 min. 30 rnin. 30 min. 30 min. <br /> Test Start Time; I 1-00 am 12:00 pm <br /> Initial Reading(R1): Spsi <br /> Final Reading(RF): 0 psi 0 <br /> Test Duration: I.hr 30 min- 30 30 min, <br /> Pass/fail Threshold or <br /> Criteria: No drop in pressure No drop in pressure No drop <br /> Test Result: pass- ic—Fa—fl—) Pass Fail Pass <br /> Comments- on repairs made prior/otesting, and texb) <br /> 87/910 raj from,sump's to dispenser 516 that piece of pipe iq fine,also from sumps to dispenser 7/8 the piece.of pin )c rsq, j­ <br /> !t0mdigxn, 5/6 to disperiser 1/2 the-sec pipe is cracked and leaks all nitrogen,also from dispen&a 1/2 to 3/4 is cracked all craas are <br /> visible on the udes.th pipe does not run stmight we had to!�st pi��by pi=- <br />