Laserfiche WebLink
Nov. 15. 2005 8: 59AM W­ Star Environmental, Inc. No. 3142 P. 6 <br /> Page 5 or-, <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> _Tei—Method Developed B-y-': <br /> Other(Specify) CSWRB <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other 65peeift) x <br /> 'reii d4uiPment Used:RAPID CONTROLS BOX, MEquipment ResRiifl <br /> TS PROBE 'on: .002 <br /> UDC # 1/2 UDC 0 3/4 UDC# 5/6 UDC # 7/8 <br /> UDC Manufacturer. western fiber }ass western,fib nlass western fitSQM river Fags <br /> UDC Material: fiberglass LbSr fiberglass ass astern <br /> UDC Depth: <br /> 33" 32" 33" <br /> _92'�tfrom�U 'Bottom to to�Top — . ..... 7i <br /> of Highest Piping Penetration: 2111 20" 20" <br /> _T1eWit_fu_mU5CBottqmtx) <br /> Lowest Electrical Penetration: 1311 12" 12" 10" <br /> Can-dition–bTUDC-prior to <br /> testing: goodgood 1good <br /> Portion of UDC Tested 23" 23" 22" 23" <br /> es me s utdown when <br /> UDC sensor detects liquid(both ( No NIA No N/A No N/A o N/A <br /> Yes S S <br /> product and water)?* <br /> Turbine shutdown reUonse--,—Ime so sec. 30 soc. 30 sec. <br /> Is system programmeor <br /> fail- Yes No N/ ;S­ No N/A A Yes No N/A c <br /> No N/A Yes <br /> safe shutdown?* �Tl <br /> d f <br /> VaWs�k versfied to be <br /> Yes NoA Yes No NIA No N/A No NIA <br /> operational? k TS <br /> Wait time between ip—plFin—g — <br /> pressure/vacuum/water and <br /> starting test 30 min. 30 min. 30 min. 30 min. <br /> Test Start Time: —.._ <br /> F-W 2:00 pin 230 pm 3:00 pm <br /> InIGFGWERRF): � 0.000 4.000 0.000 0.000 <br /> Test End Time: 2:00 prn 2:30 pm 3-,00 pm 3.30 pm <br /> _Fi naff—e a7z n—gTR F)A—-, 087 'Wo 1.020 0.000 <br /> i Test Duration: 30 min. 56 min <br /> .30 mim. 13 <br /> .� 0—inin- <br /> Change in Reading W-k I .�.087 0.0,00 .020 O OOOY W <br /> j <br /> Tiii/Nrl—Threshold or Criteria: -002 .002 .002 .002 <br /> Tcst Result- <Pasi) Fail Pass a a Fail7 <br /> Was sWn_ai removed for testing? !Z2j��_NO N/A (yes) No N/A yes No N/A Yes No NIA <br /> !aW 5 scrtsr Fo-p-e-Fly replaced and <br /> -- Yes No N/A Yes No N/A YNo N/A' <br /> verified.ftmetional after testirg? es NO N/A <br /> Commuts-(include information on repairs made prior to testing, and recommended follow-rep for failed tests)on ude 5/6 their <br /> L%1boot_Tipped__on the 91 sec pipe,and on u&1/2 both sec product pipes are cracked and the water goes from the udc 1/2 to the 87/91 <br /> sump's. <br /> If the entire depth of the UDC.is not tested,specify bow much was tested.If the answer to hof the questions indicated with an <br /> asterisk(*)is7N(Xor'rNA!',the entire UDC must be tested.(See SWRCB LG- 160) <br />