Laserfiche WebLink
Nov. 15. 2005 9.00RM Star Environmental, Inc. No. 3742 P. 8 <br /> SWRCB, JAnuary 2002 Mage 7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOX—FS <br /> Facility is Not Equipped WithSpill/overni I Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but wem Not Tested I <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard o essional Engineer <br /> Other(Specify) CSWRI3 <br /> Test Method Used: Pressure Vacuum hydrostatic <br /> Other(Specify) X <br /> Test Equipment Used: RAPID CONTROLS BOX, MTS PROBE u�pment so tton: 002 <br /> Split Box 87v Spill Box#87 fill Spill Boa#gl. v Spill Bos#sl t,ft <br /> Bucket Diameter, 12" __. 12" 12" _ 12" <br /> Bucket Depth: �...... 12" A_.., 12" _ 12" 12" <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 130 min. <br /> X30 min. 30 min. 30 min. <br /> Test Start Time: 10:00 am 10.30 am 11:00 am 11:30 am <br /> initial Reading(RI): 0.000 0.000 0.000 0.000 j <br /> Test End Time: 10.30 am 11.00 am 11:30 am 12-00 pm i <br /> Final Reading(PW): 0.000 0.000 0.000 <br /> Test Duration: _30 min_ 30 min. 30 min_ 30 min. _ <br /> Change in Reading(IZF-R1): ^ 0.E000 0.000 0.000 0.000 <br /> Pass ai o or .002 .002 .002 .002 <br /> Criteria: _ <br /> Test Result: �W_....... _ pass Fail Pass Fail Pass_ .,fail Pass tail <br /> Comments- (include information on repairs made prior to testing, and recommended fallow-up for failed tests) <br />