Laserfiche WebLink
May. 31. 2005 4:03PV W2 S Star E n v i ronmenta1, Inc. AdL No. 5305 P. 3 <br /> Software Version Installed: <br /> Complete the following checklist: <br /> ❑yes ON Is the audible alarm o erdtional`. <br /> Yes LJN08 Js the visual alarm operational? <br /> Yes _Q No* Were ail sensors vtsua y 1nS ecce , ncttona y teste and Co a operations . <br /> 0 Yes ❑ Ne Were a sensors installed at lowest point of secondary containment an postttoned so that other equipment wi <br /> not interfere with their proper operation? <br /> ❑Yes ®No* if arms <br /> a relaye to a remote monitoring station, is all communications equipment(e.g.mod <br /> operational? em <br /> * For pressurized piping systems,does the turbine automatically shut down if the piping secondary containmer <br /> Yes NO monitoring system detects a leak,fails to operate,or is electrically disconnected?If es:which sensors initial <br /> NIA positive shut-down? (Check all that apply) Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm sitive shut-down due to leaks and sensor failure/disconnection? Cl Yes; ❑No. <br /> No* For tanks that utilize the system as the tank ovcr€ill warming device(i.e.no tnmhanical overfill prevention valve <br /> ❑Yes NIA installed),is the overfill warming alarm visible and audible at the tank fill point(s)and operating properly?If so,at <br /> what percent of tank capacity does the alarmtrigger? 90 % <br /> ❑Yes* No* Was any monitoring equipment broken?If yes,identify specific sensors,probes,or other equipment replaced and <br /> list the manufacturer name and model for all n placement parts in Section E below. <br /> * as 'qui oun inside any secon ary containment systems designedas systems. ec a tat appTy <br /> El Yes No product• C7 Water.if es,describe causes in Section E,below. <br /> yes No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ❑Yes Aio* is all monitoring equipment operational per manufacturers specifications? <br /> *In section F below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments; TESTED ALL FILL BUCKETS 87 AND 91.130TH PASSED. <br /> Page 2 of 4 03/01 <br />