Laserfiche WebLink
3 \ \ <br /> SWRCB,January 2002 Page '7 of "7 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Notliquipped.With Spill/Overfill Containment Boxes ❑ <br /> SpilUOverfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Sandustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑vacuum ?Iydrostatic <br /> ❑Other(Spew) <br /> Test Equipment Used: 'i'S `j'T`� Equipment Resolution: <br /> EMEMSpill Box# Spill Box# r� Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startintest: <br /> Test Start Time: : - / Z, <br /> Initial Reading(R): S 16 O <br /> Test End Time: <br /> Final Reading(RF): z ` '7 Z .0 7 6+ <br /> Test Duration: <br /> j Change in Reading(RF-RI): - . 0 o g 3 -/ , 0 00 9 <br /> Pass/Fail Threshold or <br /> Criteria V F' <br /> TefIesµltz h� bass 44Ba►( jig C] a t Pass �]Fpil X ❑ Pass .q>♦agl <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i <br />