Laserfiche WebLink
01-15-'13 11:04 FROM-West Star Envmt Inc, +559-277-0106 T-904 P0003/0003 F-453 <br /> Monitoringsystem Certification 0 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Com lets the following checklist: <br /> Yes <br /> D No* Is the audible alarm operational? <br /> Yes <br /> * No* Is the visual alarm operational? <br /> Yes <br /> * No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ,Sk Yes D No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> I not interfere with their proper operation? <br /> [3 Yes ❑ No* If alarm$ are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> JF'N/A operational? <br /> Epes 0 No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> N/A monitoring system detects a leak,failsto operate,or is electrically disconnected? If yes-which sensors initiate <br /> positive shut-down? (Check all that apply) WSump/Trench Sensors-, Wispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failurefdisconnection? $Yes; [I No. <br /> 0 Yes [I No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> /P1 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly') If so,at what percent of tank capacity does the alarm trigger? <br /> Yes* 0 No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section B,below. <br /> n Yee UNo Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 11 [3 Product; [3 Water. If yes,describe causes in Section E.below. <br /> A" _n No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> EA:Yes I D No* Isall monitoring equipment operational pear manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Cj kg <br /> Page 2 of 3 <br />