Laserfiche WebLink
Page 1 of 1 <br /> Muniappa Naidu [EH] <br /> From: Diane Lopez [dlopez@franzenhill.com] <br /> Sent: Thursday, May 17, 2012 1:49 PM <br /> To: Muniappa Naidu [EH]; 12095256774@faxmaker.com <br /> Subject: Tentative Schedule w/SCEVHD -Escalon Mini Mart <br /> Muni-Below is our tentative schedule/punchlist. <br /> We will be on site Monday mid afternoon to begin preparations for the repairs. <br /> As for the pipe removal I would anticipate Wednesday/Thursday. After we arrive on site Monday I'm sure we'll have a better <br /> idea of dates for inspections. <br /> I will be in touch with you Monday afternoon or Tuesday morning. <br /> 1. Line out sawcutting requirements <br /> 2. Purge lines back to tank <br /> 3. Begin sawcutting using slurry vac <br /> 4. Remove dispensers and place in secure area <br /> 5. Begin conc demo and excavation -DO NOT REMOVE PIPING UNTIL INSPECTOR IS ON <br /> SITE! <br /> 6. Arrange soil sampling with SCEHD <br /> 7. With inspector, remove pipe <br /> 8. Begin piping installation <br /> 9. Perform Primary and secondary testing with inspector <br /> 10. 989 test the STPs and UDCs <br /> 11. If 989 repairs are required open CO with owner <br /> 12. backfill, compact, rebar <br /> 13. set dispenesrs <br /> 14. pour concrete <br /> Regards, <br /> Diane Lopez <br /> Franzen-Hill Corporation <br /> 1100 N. "J" St. <br /> Tulare, CA 93274 <br /> (559) 688-2977 ext. 3002 <br /> (559) 805-3368 cell <br /> (559) 688-1467 fax <br /> 6/13/2012 <br />