My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 1:11:04 PM
Creation date
6/3/2020 9:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TUE Iak-5 0 <br />EMS <br />Sacramento Equipment Maintenance Company, Inc. <br />October 31. 19B9 <br />San Joaquin Local Health District <br />P.O. Box 2009 <br />Stockton. CA. 952ol <br />Attentions Charlie Hunts <br />References 8P Petro'aeum America <br />Station #11195 <br />16500 E. Louise <br />Lathrop, CA. <br />Phones 209-983-0381 <br />P. 0 1 <br />Charlie, <br />As per our conversation. please accept this as our plan tot <br />1) excavate to all three tangy.-; tops and expose <br />existing vapor/vent valve not accessible at <br />this time. <br />2) Pull existing extractable ball vent valve and <br />isolate lines from each other so tanks can be <br />precision tested individually. <br />3) Perform PetroTite precision test on all three <br />tanks. <br />'Vol <br />4) Upon completion of test, install 4" black riser on <br />one existing vapor/vent valve, wrap with VID-10 <br />mil Tranvex tape, install 4" Universal cap, <br />backfilland install 36" CNI manhole over access <br />port to vapor/vent valve for future testing. <br />(Super-Unlead tank) <br />5) On other two existing vapor vent valves, no changes <br />except real 1 ignment of the existing manway so <br />existing vapor/vent valve can be accessible from <br />aboveground level. (Unlead & Regular leaded tanks) <br />further in+armation is needed, please contact me at <br />91 <br />--2716 for assistance. <br />r <br />Linda Steiger <br />President <br />cc: Lou Parisi <br />1 <br />t. <br />?633 ! Connie Drive (9i 6) 925-2716 Sacramento, California 9581 <br />n <br />CA L I FO R N 1A CONTRACTOR'S LICENSE #502377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.