Laserfiche WebLink
14. Mobil Oil Corporation, 16500 1-5 & Louise, Lathrop, CA 95330 <br />Nam" of supoust. ower or D"N"r Address No. ale Sum(s) City <br />State Dais of Tat <br />15. TANK TO TEST 18. CAPACITY From <br />- _Cs}? r• By most accurs" 7 ) -Station Chart <br />Non>inN pacity capacity Chert evallable �- Tank Manufacturer's Chart <br />ety ao"Ition _ Gaaats <br />Gallons l J Company Engineering Data <br />I I is t1n►e doubt as to Two Capacity? a Charts supplied with T <br />rand and reds Sea Section "DETERMINING TANK CAPACITY" `J Other <br />17. FILL -UP FOR TEST Stick Readings Total GeNons <br />to % in. Galion$ ea. Reading <br />Stick Water b!oltorrt _.1 ,�-.- ; <br />before FNFep r <br />to % In. Inventory a1 <br />FIN up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED 011 :IVERY OVANTITY <br />Tank Diameter ' Product In4ull tank (up to FIN pipe) ` <br />18. SPECIAL CONDITIONS ANO PROCEOURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />SSe man"' Sections ai>aieable. Check below and record procedure in kg (26). <br />Stage 1 <br />0 Water In tank ® High water table in tank excavation <br />® s) being tested with LVLLT <br />N <br />21. <br />TE PERATURENOLUME FACTOR (a) TO TEST THIS TANK <br />19. TANK MEASUREMENTS FOR <br />TETT ASSEMBLY <br />Is T ? I'1 Colter? t ; _• F Product in Tank _.• F Fdl-up Product at Truck _• F Expected Change I • orBOOM - I <br />of tank to Grade® .: .....:..........: •r <br />22. <br />reading after circulation _ {— <br />J� •F <br />rr <br />Add W for 4" l ................. .. <br />dpRs <br />twarest <br />Add 24" for r L or act seal ....... ,• <br />23. <br />Dips per OF In range of expected change t <br />Total tubing to assemble Approximate ........ <br />20. EXTENSION HOSE SETTING <br />24. <br />x �' '�? % "� 13 <br />I �% <br />Tank •.. <br />top to wee ............ ................ L ; rr <br />kiii 4uantity M coefficient of expansion for <br />Will tank (1S or IT) kwokvd <br />volume In this tank gallons <br />OF <br />Extend hell on auction tubo a or mora t!1 <br />11 product <br />per <br />below tank top ..................................... _„ <br />c/ ✓ `l _ 3 <br />+ <br />If Fig Ripe extends above wade. use top of fill. <br />r W •F (24), Digits per OF in lost <br />Volume T This is <br />change per digit. tsar <br />mow x31 <br />Compute to 4 decimal places. facia (a) <br />OBSERVED GRAVITY S 5 , <br />OBSERVED TEMPERATURES <br />25 � <br />CORRECTED API GRAVITYHf <br />` C. 0. E. <br />