Laserfiche WebLink
. E � <br /> F In-Tank Gauging/SIR Equipment: ' Check this box if tank gauging is used only for inventory " ,, <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folloiving checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper eatry and termination;includimgtesting for ground furies? - - <br /> ❑ Yes ❑ No* Were all tank gauging probes visually iospomd for damage and residue buildup?-- — — - <br /> ❑ Yes ❑ No* Was accuracy of system product level nmdmgs tested? <br /> ❑ Yes ❑ No* "Was accuracy of system water level readings tested? <br /> El Yes ❑ No* Were all probes reinstalled properly? <br /> (3Yes ❑ No* Were all items on the equipment mane fiwanves maintanance checklist completed? <br /> *In the Section N,below,describe how and when these deficiencies were or will be correc&d. <br /> G.Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com Tete the following checklist: <br /> Re lies ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performanac? <br /> ❑ N/A (Check all that apply) Simulated leak rata M g p L-. ❑0.1 94)-h; ❑02 g p h. <br /> AH Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requftwhe nts? <br /> 41 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> 5KYes ❑ No* For mechanical LIDS,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic 1J-Ds,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑'Y'es 43 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For c is UDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? _VM-Y -00 <br /> No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> No* Were all items on the equipment manufacturer's maintenancechccklist completed? <br /> *In the Section A,below,describe how and when these deficiencies were or wM be corrected. <br /> H. Comments: <br /> Parc 3 of 3 u lien <br />