My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 30 10 05:24p Reliable Petrol A -845-8953 p.5 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Subm t minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 9. Site map enclosec? YES[I NO Iii <br /> 2. Submit copies of I C Service Technician and/or Installer's certificate and all manufacturer training certificates for <br /> each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br /> and Safety Plan" i available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br /> drawn to scale stK wing location of repairs and/or replacements. If repairing a component, describe how this will <br /> be done. (if add piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br /> Installation Applica'on pages 4-8 as necessary for a timel plan review): <br /> 7 � VM_7t 9 <br /> 4_ List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval); <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.