Laserfiche WebLink
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR NOV 0 9 2015 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHENVIRONMENTAL <br /> 1. Site map enclosed? YES[] NO[] 111:A,Tlj nC:0'&QT"1=r'rr <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (if <br /> gddin g piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove and replace 87 Unleaded Fill bucket <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 1. OPW 1 C-2100C-DEUR Bucket <br /> 3 <br />