Laserfiche WebLink
NICK ARBABIAN729584 p.4 <br /> a .., <br /> UNDERGROUND STORAGE TANK <br /> _ SPONSE PLAN —PAGE I (one form per facility) <br /> TYPE OF ACTION Ly t.NEW PLAN CHANGE OF INFORMATION RIND` <br /> I. FACILITY INFORMATION <br /> FACILITY 113# (Agency Use Only) _ <br /> BUSINESS NAME(Same as FACILITY NAME) Roz. <br /> BUSINESS S]TEADDRESSp ry R03. C7 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Tazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> T Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardou§. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container.Waste material shall be disposed <br /> appropriately. <br /> Y Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hazardous material.If8re water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-harerdous)from sumps,spill containers,ctc.will not be disposed to storm water systems- <br /> ? We will review secondary oontainmeot systems for passible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the prodtmUwaste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or remitirg;material from such a combination is not compatible with secondary containment <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary_ <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED (Complete ly if april icable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R20. R30. <br /> RI 1. R21. R31. <br /> R12. Im• R31 <br /> A13. R23, R33, <br /> RI4. R24. R34. <br /> R1 S. R25_ R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME 2tS _ <br /> QNMA A <br /> } Rao. TITLE R50 <br /> NAME R41 TITLE R51. <br /> A f C.V- t3WA e:V? <br /> NAME Rae TITLE <br /> AY <br /> � A c0 - <br /> NAM R43. TITLE 103. <br /> V. MONITORING INDICATORS <br /> IIF KO�N�ITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 1114dditional system testing or data collection Oil spection by qualified persons L7"T(ecalibration of equipment <br /> Other: T//vtl3Zy <br /> ­n-le ,413t'JVIS CHS-`-M B®X d& WI{., SL �t3S�1S� W1 TVenJ A <br /> tv�4,jr-%M.. AtvL� cr�R t�c'•c 4� <br /> UST Response Plan praoos)-1/3 <br />