Laserfiche WebLink
Page 7 of 8 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />e c ov <br />ECO-CHEK COMPLIANCE <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />* Spill bucket(s) were tested separately as part of the annual monitor certification test. <br />